Skip to main content

1. Survey Stage

  • Site reconnaissance
  • Vertical control survey
  • Horizontal control survey
  • Installation & survey of cross-section stakes
  • Topographic surveying

2. Cartography & Data Compilation

  • Procurement of relevant map sheets
  • Georeferencing and integration of cadastral maps
  • Overlay of related layers (red–yellow–green control lines, topographic maps, public/private land, urban planning maps, protection forests, etc.)
  • Delineation of river administrative boundaries
  • Production of river cadastral map books

3. Review by River Branch (optional)

4. WRA Review

  • Exempt from convening the Review Committee.

5. Approval

  • Submit consolidated deliverables to the Water Resources Agency (WRA); the WRA forwards them to the Ministry of Economic Affairs (MOEA) for approval.

6. Promulgation

  • According to the numbers of reports/drawings specified by the WRA, the River Branch submits to the WRA, which then files to the MOEA for public announcement.

 Photo 1. Schematic of RTK (Real-Time Kinematic) positioning for a river-area survey.

Photo 1. Schematic of RTK (Real-Time Kinematic) positioning for a river-area survey.